Back

TCO Project – Orken Village

E-Houses
Object
7 modular electrical substations
Client
Schneider Electrics
Scope of work
EPC project for the procurement, prefabrication, construction, painting, architectural fit-out, passive fire protection, HVAC and E&I installation, electro-instrumental fit-out and FAT of 14 bolted modules, for the construction of 7 electrical substations.
Categoria
Tecnical details

Structure: 280,000 kg

Dimensions: (17 modules) 25 x 6.7 x 4.6 m LxWxH